Clash Detection With BIM
In terms of construction, a clash usually refers to a conflict between various elements of a design that aren't coordinated spatially. And BIM, in this regard too, plays quite a crucial role in the real-time detection of clashes even before the on-site construction procedures begin.
According to the Journal of the Korea institute of building construction, the installation of BIM is primarily meant for clash detection in the design. This very fact enlightens the significance of clash detection with BIM. A single design is generally a comprehensively detailed model by professionals from different areas of engineering, i.e., civil engineers, electrical engineers. BIM analyses the compatibility of all these individual models to assess if any element of one model is overlapping with an element of the other one. This practice ensures that all these models complement one another to make a model perfect in all aspects.
Enhanced Clash Detection Through BIM
BIM clash detection comes to help the construction industry, which is already subjected to numerous issues such as continuously escalating budgets, problems regarding meeting the deadlines due to various delays, and last-minute shocks that arise out of nowhere because of clashes in the models. International Journal of Construction Education and Research, 2015 discusses how BIM becomes an integral part of the construction as it comes in handy to prepare effective clash reports in real-time. Architects avoid those last-minutes shocks by using BIM's fool-proof clash detection, which streamlines the construction procedure to a great extent by detecting clashes at the early stages of designing. Conventional design procedures had various elements clashing with each other that later on end up in architectural disasters, delay in delivery, escalating budgets, and frustrating re-evaluations. While BIM, a fully automated and integrated system, detects all clashes in real-time by assessing different relative models simultaneously.
Perks of Clash Detection With BIM
Collaboration with BIM clash detection at the early stages of design is crucial to a resultant design that is absolutely clash-free and result-oriented, according to a research paper, Buildings 7, 2017, that profoundly studies BIM specifications in the UK.
Accuracy of Design
BIM is known to make things easier for the whole team, be it civil engineers, electrical engineers, architects, or managers. It ensures the accuracy of the documents by detecting all kinds of clashes, be it any phase of the construction. In the modern world of construction, if a clash is resolved at one point, it gets resolved in all the documents.
Fewer Needs of Alterations
BIM detects the clashes at the early stages of designing or preparing the model, which cuts down on extra cost, labour and time generally drained out due to alterations during construction. Resolution of all clashes beforehand helps to avoid extensive alterations during the construction phase, which is, in all senses, beneficial to the whole team.
Stronger Collaboration Between Teams
Professionals from various disciplines in the team can easily collaborate by BIM's user-friendly software that readily updates any changes in the design so it's available for all the team members working on the same project. Any chances of errors are reduced due to weak collaboration or any negligence due to lack of updates
Conclusion:
BIM has totally revolutionized the idea of construction designs through its smart clash detection that is capable of detecting, visualizing, and resolving all sorts of clashes in the design. This feature eliminates numerous other issues that hinder the way to the fast and effective execution of construction plans. BIM empowers the whole team with many features to resolve clashes.
Related Blogs
What is Level of Development (LOD) in BIM
LOD, or Level of Development, is the set of standards or details that is to be incorporated in a BIM model. These are standards used in the industry for different design stages, 3-D Modeling, planning, scheduling, quantity takeoff, on-site quality control, and fabrication. By using this set of standards, engineers and architects can easily communicate with each other on different matters without any confusion.
What is "Point Cloud to BIM"?
The Point Cloud to BIM method can be used for site verification, design validation, quantity takeoff, or as additional evidence of built conditions as well as new construction and budget estimation. Point cloud to BIM (Building Information Modeling) is a process that involves the conversion of laser-scanned point cloud data into a digital BIM model. This transformation enables the integration of accurate as-built data into the design and construction phases of a building project.
Revolution of Industry 4.0 in construction projects
In the realm of construction planning and design, Industry 4.0 brings forth innovative tools and methodologies that enhance efficiency and collaboration. Building Information Modeling (BIM) is one such technology that enables the creation of detailed digital models, encompassing architectural, structural, and mechanical elements of a building. These models serve as a centralized platform for stakeholders to collaborate, identify clashes or conflicts, and make informed decisions throughout the design phase. BIM's integration with data analytics also allows for improved project visualization, cost estimation, and risk analysis, resulting in more accurate planning and reduced rework.